Special thanks go-out to SAI's Dr. Ryan Jenkins for sharing this view of the CSVT River Bridge under construction. SAI is performing the final alternate design of this roughly 4500’ long, 15-span, steel-girder bridge; the picture was taken from Abutment 1 during an early phase of construction. Piers 4 and 5 are visible.