SR 1011-470, Pond Eddy Bridge over the Delaware River Update- Steel erection is continuing with the two bottom chords, the floor system (floor beams and stringers), and about 3 panel points of the truss at the pier (top chord, verticals, diagonals, bracing, etc.) installed and bolted up on the NY side.