SR 0403-10B, Moxham Stonycreek Bridge Replacement, Johnstown, PA (PennDOT, District 9-0) - progress photo showing the beginning of the steel erection process for the first half of the new structure.

Once again SAI was a proud sponsor of the 16th Annual Denny Shaffer Memorial Golf Outing at the Tom's Run Course of Chestnut Ridge on Friday, August 11, 2017. Left to right are Eric Weltmer (AEG), Brian Long (SAI), and Don Stark (AEG).

August 9, 2017, Kissimmee, Florida- The successful team of STV and SAI Consulting Engineers, Inc. has been selected by FDOT District 5 for a district-wide continuing services agreement for structural and roadway design support. SAI will provide roadway and structural design support as a subconsultant to STV, Inc.

SR 1011-470, Pond Eddy Bridge over the Delaware River Update- Steel erection is continuing with the two bottom chords, the floor system (floor beams and stringers), and about 3 panel points of the truss at the pier (top chord, verticals, diagonals, bracing, etc.) installed and bolted up on the NY side.

SR 0403-10B, Moxham Stonycreek Bridge Replacement, Johnstown, PA (PennDOT, District 9-0) - progress photo showing the first half of the pier built and finishing up forming the abutments. Steel erection should occur within a few weeks.

Pages

Subscribe to SAI Consulting Engineers RSS