Department: 
Specialized Construction Management

SAI was responsible for the construction management and inspection of this complex urban roadway infrastructure project for Pittsburgh's new stadium development.

Physical Features: 
  • Construction of concrete roadway for North Shore Drive, Steelers Way, and West General Robinson Street (Several city blocks).
  • Granite curbs.
  • Drainage.
  • Water line.
  • Irrigation.
  • Landscaping.
  • Highway lighting.
  • Signs.
Other Features: 
  • Material testing.
  • Contractor submittal and shop drawing review.
  • Agency coordination.
  • Cost control monitoring.
  • Claims review & analysis.
  • Project documentation.
  • CPM scheduling.
  • Quality assurance monitoring.

Location