Department: 
Site Design

SAI was responsible for performing the initial site investigation; demolition and site grading plans; preliminary and final streetscape and roadway design; construction consultation; and construction management and inspection for this dynamic urban redevelopment project.

Physical Features: 
  • 1,900' of city streets for new housing sites.
  • 3,900 S.Y. of roadway (PCC base course with asphalt overlay).
  • 6,300 L.F. of sanitary and storm sewer lines with 18 manholes and 22 Inlets.
  • 1,700 L.F. of 6" and 8" ductile iron water line.
Other Features: 
  • Demolition of building slabs and site grading.
  • Sewer and water line installation.
  • Coordination with property owners, contractors, developers, governmental agencies, and businesses.
  • Installation of concrete curbs, sidewalks, and handicap ramps on four streets.
  • New street lighting system.
  • Landscaping, including planting 70 various trees.
  • Maintenance of vehicular and pedestrian traffic during construction.
  • Construction of amenities such as planting margins, blockstone edging, and blockstone paving areas.