SAI provided structural design services for temporary bridge structures and the temporary shoring necessary for the contractor to complete this complex roadway widening project.

Physical Features: 
  • Two 45' spans over S.R. 0022.
  • Pile bent pier.
  • Wire mesh abutments.
  • Simple-span 50' over stream (stub abutment on single row piles).
  • Temporary shoring utilizing project micro piles.
  • Cantilever and anchor design.
  • Several thousand feet of wall design.
Other Features: 
  • Widening of heavily used state route in a narrow corridor along side of a steep mountain slope.