Department: 
Traffic Engineering Services

SAI was responsible for the design of this urban project that includes preliminary and final design for the intersection reconfiguration.  The project includes a new culvert over Lick Run and new traffic signals.

Physical Features: 
  • Approximately 1 mile of roadway design and intersection reconfiguration.
  • 200' concrete box Culvert extension over Lick Run, S.R 2040.
Other Features: 
  • Collection of traffic data.
  • Analysis of traffic data utilizing HCS and SYNCHRO/Sim Traffic.
  • Design field view development.
  • Construction plans.
  • ADA ramp design.
  • Traffic signal plan.
  • Drainage design.
  • Erosion and sedimentation pollution control plan.
  • Traffic control plan.
  • Signing and pavement marking plan.
  • Agency coordination.
  • Public involvement.
  • PS&E package.