Department: 
Highway Design

SAI was responsible for the preliminary superstructure and substructure design for the design build multi-span overpass bridge/interchange over I-80 and the preliminary and final design of a new roadway on a new alignment. This project will tie in S.R. 6830 to the new I-80 ramps and then connect the I-80 ramps to S.R. 6830 beyond the DuBois Regional Airport connector road now renamed the Francis H. "Bud" Scherer Highway.

Physical Features: 
  • Five miles of new two-lane rural arterial roadway.
  • 306'-long two-span continuous composite prestressed concrete I-beam bridge over I-80.
  • Three concrete box culverts.
Other Features: 
  • Needs analysis and preliminary alignment study.
  • Community involvement/public participation.
  • Traffic studies including capacity and accident analysis.
  • Permit acquisition and agency coordination.
  • Demolition plans.
  • Fast-track design project.
  • Hydraulic design/hydrologic studies.
  • Stormwater management/drainage design.
  • Traffic maintained during construction via detours on existing roadways.
  • Signing and pavement marking plans.
  • Shop drawing review.