Department: 
Streetscape Design

SAI was responsible for performing the site investigation, preliminary and final roadway, sidewalk design, shop drawing review, and construction inspection of this important urban streetscape project.

Physical Features: 
  • 1400' of urban street reconstruction.
  • 43 subgrade building vaults.
Other Features: 
  • Inspection and reports for 43 building vaults below sidewalks.
  • Lighting design.
  • Traffic impact statement.
  • Traffic signal design for four intersections.
  • Contra-flow bus lane study.
  • Traffic control plan for vehicles and pedestrians.
  • Water line.
  • Sewer line.
  • Coordination with property owners/businesses.

Location