Neville Island I-79 Main Line and Ramps Bridge Repairs

Allegheny County, Pennsylvania SAI was responsible for the preliminary design, final design, and consultation during construction for the repairs of ...

SR 1036-002, Riddlesburg Bridge Rehabilitation

SAI was responsible for the preliminary and final design for superstructure replacement of the Riddlesburg Bridge over the Raystown Branch ...

SR 0070-22M, Belle Vernon Bridge Preservation

SAI was responsible for the preliminary engineering and final design for the preservation of the Belle Vernon Bridge (SR 0070) ...

SR 3011-451, Grafton and Campbell’s Mill Bridge Rehabilitation

SAI was responsible for preliminary and final design and construction consultation including the design of new decks, bearing replacements, steel ...

SR 0376-B04, Vanport Bridge Preservation

SAI was responsible for the preliminary engineering, final design, and services during construction for the preservation of the Vanport Bridge ...

SR 0285-A05, Birmingham Bridge Preservation

SAI performed the preliminary engineering, final design, and services during construction for the structural steel repairs, bearing system replacements, substructure ...

I-80 Bridge Preservation Project – 9 Bridges (Groups 1 and 2)

SAI was responsible for the preliminary engineering, final design, shop drawing review, and consultation during construction for bridge preservations including ...