![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/DSC07491-150x150.jpg)
SR 1036-002, Riddlesburg Bridge Rehabilitation
SAI was responsible for the preliminary and final design for superstructure replacement of the Riddlesburg Bridge over the Raystown Branch ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/IMG_0005-150x150.jpg)
SR 0070-22M, Belle Vernon Bridge Preservation
SAI was responsible for the preliminary engineering and final design for the preservation of the Belle Vernon Bridge (SR 0070) ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/IMG_1178-150x150.jpg)
SR 3011-451, Grafton and Campbell’s Mill Bridge Rehabilitation
SAI was responsible for preliminary and final design and construction consultation including the design of new decks, bearing replacements, steel ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/IMG_7603-150x150.jpg)
SR 0376-B04, Vanport Bridge Preservation
SAI was responsible for the preliminary engineering, final design, and services during construction for the preservation of the Vanport Bridge ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/1_Award-Photo-if-Chosen-150x150.jpg)
SR 0285-A05, Birmingham Bridge Preservation
SAI performed the preliminary engineering, final design, and services during construction for the structural steel repairs, bearing system replacements, substructure ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/October-23-2015-Photos-168-150x150.jpg)
I-80 Bridge Preservation Project – 9 Bridges (Groups 1 and 2)
SAI was responsible for the preliminary engineering, final design, shop drawing review, and consultation during construction for bridge preservations including ...