SR 1036-002, Riddlesburg Bridge Rehabilitation

SAI was responsible for the preliminary and final design for superstructure replacement of the Riddlesburg Bridge over the Raystown Branch ...
Read More

SR 0070-22M, Belle Vernon Bridge Preservation

SAI was responsible for the preliminary engineering and final design for the preservation of the Belle Vernon Bridge (SR 0070) ...
Read More

SR 3011-451, Grafton and Campbell’s Mill Bridge Rehabilitation

SAI was responsible for preliminary and final design and construction consultation including the design of new decks, bearing replacements, steel ...
Read More

SR 0376-B04, Vanport Bridge Preservation

SAI was responsible for the preliminary engineering, final design, and services during construction for the preservation of the Vanport Bridge ...
Read More

SR 0285-A05, Birmingham Bridge Preservation

SAI performed the preliminary engineering, final design, and services during construction for the structural steel repairs, bearing system replacements, substructure ...
Read More

I-80 Bridge Preservation Project – 9 Bridges (Groups 1 and 2)

SAI was responsible for the preliminary engineering, final design, shop drawing review, and consultation during construction for bridge preservations including ...
Read More