SAI performed an alternatives analysis, preliminary engineering, and final design for the replacement structure of a 79-year-old structurally deficient bridge…
Last night SAI staff attended the ACEC/PA Diamond Awards held at the Lancaster Marriott at Penn Square in Lancaster, PA.…
After the original bridge was destroyed by Hurricane Irene, SAI was contracted for the emergency preliminary engineering and final replacement…
SAI was responsible for the preliminary engineering, final design, and construction consultation of approximately 1 mile of realignment of SR…
SAI was responsible for the preliminary engineering, final design, and services during construction for the replacement of a structurally deficient…
SAI teamed with Michael Baker Corporation for the design of this important project to construct two missing interchange ramps at…
SAI was responsible for the design location study, preliminary engineering, final design, and services during construction for the replacement of…
SAI was responsible for the design location study, preliminary engineering, final roadway and structure replacement design, and construction consultation for…
SAI performed the preliminary engineering, final design, and construction consultation for the replacement of the Culmerville Bridge carrying S.R. 1028…