SAI was responsible for the final design/build of over one mile of full-depth roadway reconstruction, with realignment of the west-bound…
SAI was responsible for the construction inspection and management of the replacement of the T-670 Paxton Road Bridge replacement in…
SAI worked as a subconsultant to the prime construction management and inspection consultant CDR Maguire, to provide construction inspection and…
By: Erika Jackson, WWSB ANNA MARIA ISLAND, FL (WWSB) – “There’s a lot of traffic, a lot of people want to…
By: Rick Dandes, The Daily Item The reconstruction and upgrading of several Valley roadways continues throughout the region and will…
Pa. Rte. 66 is a 139-mile southwesterly-northeasterly route in the northwest area of the state. In April 2003, Jones Township…
SAI was responsible for the construction inspection of a major bridge over Monongahela River that consists of four spans: one…
SAI was responsible for the construction inspection and scheduling of the West End bridge connection interchange improvements that includes the…
SAI was responsible for providing full CEI services for this project, which reconstructed US 27 to widen the roadway from…
SAI was responsible for the construction inspection of a new multi-span continuous steel plate-girder bridge that was built along side…