SAI was responsible for the NBIS and Fracture-Critical (FCM) bridge inventory/inspection of 21 various steel bridge structures ranging from 480′-4,000′…
Responsible for the NBIS inventory/inspection of various steel and concrete bridge structures ranging from 225′ to 2421′ in length over…
SAI performed an in-depth inspection, repair and rehabilitation design, shop drawing review and consultation during construction for this heavily-used parking…
SAI was responsible for performing an in-depth inspection and condition assessment necessary for generating a report that evaluated different options…
SAI is currently performing ongoing in-depth inspections of the parking structure, repair and rehabilitation design, shop drawing review, and consultation…
SAI was responsible for performing the initial site investigation; preliminary engineering and final streetscape and site design; and construction consultation…
SAI was responsible for performing the initial site investigation, demolition and site grading plans, preliminary engineering and final streetscape and…
SAI was responsible for performing the final site design and the construction management and construction inspection of this large brownfield…
SAI was responsible for the preliminary and final replacement design of this pedestrian bridge on the Eliza Furnace Trail over…
SAI was responsible for the preliminary engineering, final structural design, and construction consultation services for this signature pedestrian bridge. A…