June 29, 2022: SAI Consulting Engineers, Inc./Trumbull began working on the bid for the Central Susquehanna Valley Transportation project River Bridge in the Summer of 2015. We were proud to be at the ribbon cutting for the Northern Section including this structure and the groundbreaking for the Southern Section construction. Through contractor/designer collaboration our team completed an efficient alternate design of Pennsylvania’s 8th longest structure, a 4,545-foot long structure spanning the West Branch Susquehanna River. Pictured are: Mike Newman, Jason DeFlitch, Jake Ploeger, Ray Henney, Robert Cane, Dr. Ahmad Ahmadi, and Colin Drager.