Marketing Up To The Minute: |
October 24, 2022, Lake Mary, Florida – SAI’s Florida Design Team won a Design Project with FDOT District 5. The win is for the design of six lanes of 24.126 miles of I-95. The resurfacing and safety improvements apply to both Northbound and Southbound including 8 interchanges. Two separate plan sets will be developed, one for each direction (NB) and (SB). SAI will be responsible for the project management, roadway, drainage, traffic control and signing and pavement markings design. The estimated design agreement is for $4.4 million.
|