Neville Island I-79 Main Line and Ramps Bridge Repairs

Allegheny County, Pennsylvania

SAI was responsible for the preliminary design, final design, and consultation during construction for the repairs of 27 span structures located within the limits of the I-79/SR 0065/SR 0051 interchanges, which includes the main steel thru-tied arch span over the Ohio River, and the associated deck girder approach spans. In addition, this project includes 8 ramps, and the adjacent Glenfield viaduct bridge.

Physical features:

  • 725′ main span steel thru-tied arch over the Ohio River and associated deck girder approach spans and ramps.
  • 10-span curved steel Glenfield viaduct.

Other features:

  • Multiple PS&Es grouping various structures.
  • In-depth bridge inspection.
  • Fatigue repair details.
  • Expansion dam repairs including main span expansion dams repair.
  • Deck sounding, concrete repair, and LMC replacement.
  • Substructure repairs and numerous rocker bearing replacements.
  • Full superstructure painting.
  • Miscellaneous steel repairs including girder splice plates.
  • Sign structure repairs.
  • Updating analysis, live load ratings, and paint loading, including tied-arch.

Client Owner: Pennsylvania Department of Transportation, District 11-0

Completion Date: 2023

Cost: $44,100,000