US 27 from North of SR 540 to North of 542 – Construction Engineering and Inspection

SAI was responsible for providing full CEI services for this project, which reconstructed US 27 to widen the roadway from 4 lanes to 6 lanes in this heavily traveled area of Polk County near the Town of Dundee.

Physical features:

  • Milling and resurfacing utilizing FC-5 Friction Course.
  • Heavy vehicular traffic.
  • Residential and business areas.
  • Reconstruction, widening 4 lanes to 6 lanes.
  • Box culvert extensions.
  • Drainage.

  Other features:

  • Erosion Control
  • Maintenance of Traffic.
  • Audible and vibratory pavement markings.
  • Signing, including multi-post signs.
  • Thermoplastic pavement markings.
Client/Owner: Florida Department of Transportation, District 1
Completion Date: 2012
Construction Cost: $10,500,000