SR 0019-A27 and SR 0060-A33, West End Bridge Connection – Construction Inspection

SAI was responsible for the construction inspection and scheduling of the West End bridge connection interchange improvements that includes the construction of a direct connection between the West End By-Pass and the West End Bridge, and replacement of the Main Street Bridge.

Physical features:

  • 14,000′ of roadway/ramps.
  • Replacement of four Bridges.
  • Construction of three retaining walls.
  • Relocation of 48″ and 42″ sanitary sewer lines.
  • Three signalized intersections.

Other features:

  • Lengthening acceleration and deceleration lanes.
  • Guide rail replacement.
  • Highway lighting.
  • Landscaping.
  • Traffic signals, signing, and pavement marking.
  • ITS components.
Client/Owner: Pennsylvania Department of Transportation, District 11-0
Completion Date: 2010
Construction Cost: $52,600,000