SAI was responsible for the design location study, preliminary engineering, final design, and services during construction for the replacement of…
SAI was responsible for the design location study, preliminary engineering, final roadway and structure replacement design, and construction consultation for…
SAI performed the preliminary engineering, final design, and construction consultation for the replacement of the Culmerville Bridge carrying S.R. 1028…
SAI performed preliminary engineering and final roadway design to eliminate two closely paired “T” intersections and provide a single, new,…
SAI was responsible for preliminary and final design of widening and overlay of S.R. 0030 and S.R. 0981 addressing urban…
SAI is responsible for the preliminary enginering and final roadway and structure design for a project that comprises 12 multi-span bridges,…
SAI was responsible for the preliminary and final roadway and structure design of four miles of new four-lane expressway over…
SAI was responsible for the preliminary and final highway as well as structure design of the reconstruction/rehabilitation of Ft. Pitt…
SAI is responsible for the total reconstruction design review activities on three separate sections, totaling 43 miles of mainline reconstruction…
As a subconsultant to Edwards and Kelcey under a State-wide Open-end contract, SAI was responsible for assisting in the analysis…