SR 0885-A36, Bates Street/ 2nd Avenue Improvements (Eliza Furnace Trail Bridge)

SAI was responsible for the preliminary and final replacement design of this pedestrian bridge on the Eliza Furnace Trail over ...
Read More

East Side Hometown Streets, Ellsworth Pedestrian Bridge

SAI was responsible for the preliminary engineering, final structural design, and construction consultation services for this signature pedestrian bridge. A ...
Read More

Forbes Avenue and Market Street Reconstruction

SAI was responsible for performing the in-depth inspection of building vaults, preliminary engineering and final roadway design, traffic control plan, street ...
Read More

Fifth Avenue Hometown Streets – Market Street to Wood Street Streetscape Improvements

SAI was responsible for the preliminary engineering and final sidewalk replacement design as part of a Hometown Streets sidewalk/streetscape renovation ...
Read More

Midland Avenue Streetscape

SAI was responsible for performing the preliminary and final sidewalk and curb design, traffic control plan, street lighting design, scheduling, ...
Read More

SR 0837-A24, East Carson Street – Widening and Reconstruction

SAI was responsible for performing the in-depth inspection of building conditions including vault locations, utility service, and access requirements; preliminary ...
Read More