Open-End Small Bridges & Structure – Sidewalk Gaps Preliminary Engineering/Final Design
Pittsburgh, Pennsylvania SAI was responsible for the design for pedestrian improvements to more than 7,000 linear feet of sidewalk within ...
SR 0885-A36, Bates Street/ 2nd Avenue Improvements (Eliza Furnace Trail Bridge)
SAI was responsible for the preliminary and final replacement design of this pedestrian bridge on the Eliza Furnace Trail over ...
East Side Hometown Streets, Ellsworth Pedestrian Bridge
SAI was responsible for the preliminary engineering, final structural design, and construction consultation services for this signature pedestrian bridge. A ...
Forbes Avenue and Market Street Reconstruction
SAI was responsible for performing the in-depth inspection of building vaults, preliminary engineering and final roadway design, traffic control plan, street ...
Fifth Avenue Hometown Streets – Market Street to Wood Street Streetscape Improvements
SAI was responsible for the preliminary engineering and final sidewalk replacement design as part of a Hometown Streets sidewalk/streetscape renovation ...
Midland Avenue Streetscape
SAI was responsible for performing the preliminary and final sidewalk and curb design, traffic control plan, street lighting design, scheduling, ...
SR 0837-A24, East Carson Street – Widening and Reconstruction
SAI was responsible for performing the in-depth inspection of building conditions including vault locations, utility service, and access requirements; preliminary ...