![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/IMG_0846-150x150.jpg)
SR 0885-A36, Bates Street/ 2nd Avenue Improvements (Eliza Furnace Trail Bridge)
SAI was responsible for the preliminary and final replacement design of this pedestrian bridge on the Eliza Furnace Trail over ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/IMG_9110-150x150.jpg)
East Side Hometown Streets, Ellsworth Pedestrian Bridge
SAI was responsible for the preliminary engineering, final structural design, and construction consultation services for this signature pedestrian bridge. A ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/012-150x150.jpg)
Forbes Avenue and Market Street Reconstruction
SAI was responsible for performing the in-depth inspection of building vaults, preliminary engineering and final roadway design, traffic control plan, street ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/DSCN3088-150x150.jpg)
Fifth Avenue Hometown Streets – Market Street to Wood Street Streetscape Improvements
SAI was responsible for the preliminary engineering and final sidewalk replacement design as part of a Hometown Streets sidewalk/streetscape renovation ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/Midland-Streetscape-026-150x150.jpg)
Midland Avenue Streetscape
SAI was responsible for performing the preliminary and final sidewalk and curb design, traffic control plan, street lighting design, scheduling, ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/IMG_5759-150x150.jpg)
SR 0837-A24, East Carson Street – Widening and Reconstruction
SAI was responsible for performing the in-depth inspection of building conditions including vault locations, utility service, and access requirements; preliminary ...