![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/IMG_0535-150x150.jpg)
Posvar Hall Parking Garage
SAI performed an in-depth inspection, repair and rehabilitation design, shop drawing review and consultation during construction for this heavily-used parking ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/short-term-park-pia-150x150.jpg)
Pittsburgh International Airport Short-Term Parking Garage Inspection and Option Evaluation
SAI was responsible for performing an in-depth inspection and condition assessment necessary for generating a report that evaluated different options ...
![](https://909024.a2cdn1.secureserver.net/wp-content/uploads/2018/06/ohara1-150x150.jpg)
O’Hara Street Parking Garage – Rehabilitation Design
SAI is currently performing ongoing in-depth inspections of the parking structure, repair and rehabilitation design, shop drawing review, and consultation ...