SAI was responsible for the preliminary engineering, final design, and services during construction for the replacement of a structurally deficient…
SAI teamed with Michael Baker Corporation for the design of this important project to construct two missing interchange ramps at…
SAI was responsible for the design location study, preliminary engineering, final design, and services during construction for the replacement of…
SAI was responsible for the design location study, preliminary engineering, final roadway and structure replacement design, and construction consultation for…
SAI performed the preliminary engineering, final design, and construction consultation for the replacement of the Culmerville Bridge carrying S.R. 1028…
SAI performed preliminary engineering and final roadway design to eliminate two closely paired “T” intersections and provide a single, new,…