SAI was responsible for the preliminary and final roadway and structure design of four miles of new four-lane expressway over…
SAI was responsible for the preliminary and final highway as well as structure design of the reconstruction/rehabilitation of Ft. Pitt…
SAI is responsible for the total reconstruction design review activities on three separate sections, totaling 43 miles of mainline reconstruction…
As a subconsultant to Edwards and Kelcey under a State-wide Open-end contract, SAI was responsible for assisting in the analysis…