As a subconsultant to Edwards and Kelcey under a State-wide Open-end contract, SAI was responsible for assisting in the traffic…
SAI was responsible for preliminary construction plans for the replacement of traffic signals at eight intersections in the City of…
SAI was responsible for the preliminary engineering, final design, and construction consultation of approximately 1 mile of realignment of SR…
SAI was responsible for the preliminary engineering, final design, and services during construction for the replacement of a structurally deficient…
SAI teamed with Michael Baker Corporation for the design of this important project to construct two missing interchange ramps at…
SAI was responsible for the design location study, preliminary engineering, final design, and services during construction for the replacement of…
SAI was responsible for the design location study, preliminary engineering, final roadway and structure replacement design, and construction consultation for…
SAI performed the preliminary engineering, final design, and construction consultation for the replacement of the Culmerville Bridge carrying S.R. 1028…
SAI performed preliminary engineering and final roadway design to eliminate two closely paired “T” intersections and provide a single, new,…
SAI was responsible for preliminary and final design of widening and overlay of S.R. 0030 and S.R. 0981 addressing urban…