SAI was responsible for the preliminary and final design for superstructure replacement of the Riddlesburg Bridge over the Raystown Branch…
SAI was responsible for the preliminary engineering and final design for the preservation of the Belle Vernon Bridge (SR 0070)…
SAI was responsible for preliminary and final design and construction consultation including the design of new decks, bearing replacements, steel…
SAI was responsible for the preliminary engineering, final design, and services during construction for the preservation of the Vanport Bridge…
SAI performed the preliminary engineering, final design, and services during construction for the structural steel repairs, bearing system replacements, substructure…
SAI was responsible for the preliminary engineering, final design, shop drawing review, and consultation during construction for bridge preservations including…
SAI was responsible for the preliminary and final design and construction management/inspection of the intersection improvements at the northern and…
As a subconsultant to Edwards and Kelcey under a State-wide Open-end contract, SAI was responsible for assisting in the traffic…
SAI was responsible for preliminary construction plans for the replacement of traffic signals at eight intersections in the City of…
SAI was responsible for the preliminary engineering, final design, and construction consultation of approximately 1 mile of realignment of SR…