SAI was responsible for the preliminary engineering and final sidewalk replacement design as part of a Hometown Streets sidewalk/streetscape renovation…
SAI was responsible for performing the preliminary and final sidewalk and curb design, traffic control plan, street lighting design, scheduling,…
SAI was responsible for performing the in-depth inspection of building conditions including vault locations, utility service, and access requirements; preliminary…
SAI was responsible for the preliminary and final design for superstructure replacement of the Riddlesburg Bridge over the Raystown Branch…
SAI was responsible for the preliminary engineering and final design for the preservation of the Belle Vernon Bridge (SR 0070)…
SAI was responsible for preliminary and final design and construction consultation including the design of new decks, bearing replacements, steel…
SAI was responsible for the preliminary engineering, final design, and services during construction for the preservation of the Vanport Bridge…
SAI performed the preliminary engineering, final design, and services during construction for the structural steel repairs, bearing system replacements, substructure…
SAI was responsible for the preliminary engineering, final design, shop drawing review, and consultation during construction for bridge preservations including…
SAI was responsible for the preliminary and final design and construction management/inspection of the intersection improvements at the northern and…